METRO WING

• Metro wing is headed by a Chief Engineer with one Circle and five Divisions for development of the road infrastructure facilities for decongestion of traffic within Chennai Metropolitan Area (CMA).

• This wing was exclusively established to execute the projects for the improvement of transport network in and around Chennai City, as recommended in the Comprehensive Traffic and Transportation Study (CTTS) and the second master plan developed by Chennai Metropolitan Development Authority (CMDA) under the Chennai Metropolitan Development Plan (CMDP) Scheme.

• To enhance safe and sustainable urban transport system Grade-separators, High level bridges, Widening of roads/ bridges, Formation of new link roads, Bypasses, Foot Over Bridges (FOB) with Escalators, etc are being taken up.

• Construction/Widening of Road Over Bridges/Road under Bridges within the CMA, under Railway Works Programme (RWP) on cost sharing basis (50:50) are also taken up.

I.FOLLOWING WORKS ARE COMPLETED DURING THE FINANCIAL YEARS 2022-23 & 2023-24.

• Grade separator at Medavakkam completed and opened to traffic on 13.05.2022

• Grade Separator at Velachery completed and opened to traffic on 17.09.2022.

• Road Over Bridge at LC 32 Perungalathur (Chengalpattu to Chennai Arm) completed and opened to traffic on 17.09.2022.

• Foot Over Bridge with escalator connecting the Tambaram Railway station & bus stand in GST Road completed and opened to public use on 26.04.2023.

• Road Over Bridge at LC 32 Perungalathur (Srinivasa Raghava Nagar Arm) completed and opened to traffic on 28.06.2023.

• High Level Bridge across Buckingham canal in Thiruvotriyur completed and opened to traffic on 07.09.2023.

II. FOLLOWING WORKS ARE IN PROGRESS

• High Level Bridge across Coovam river in Paruthipattu.

• Widening the East Coast Road to six lane at Palavakkam.

• Formation of Tambaram Eastern bypass from Km 5/450 – 8/080 at Nedungundram.

• Road Over Bridge at LC 32 Perungalathur (Chennai – Chengalpattu Arm and Tambaram Eastern Bypass Arm).

• Limited Use Subway at LC 27 Chrompet, Radha Nagar.

• Grade Separator on Mount-Poonamallee-Avadi road from MIOT Hospital to Mugalivakkam and Vehicular Under Pass at Madipakkam. These works funded by State Government are being executed by Chennai Metro Rail Limited (CMRL) integrated with Metro Rail projects.

• Grade Separator at Madhya Kailash

• Widening the East Coast Road to six lane at Kottivakkam

Further, the following works are commenced during this financial year 2023-24

i) Widening the East Coast Road (ECR) to six lane in Neelangarai, Injambakkam and Sholinganallur villages.

ii) Formation of Tambaram Eastern bypass in Km 3/900 to 5/450 in Puthur village.

iii) Road Over Bridge at LC 16 near Minjur.

Further, the following works will be commenced during this financial year 2023-24

i) Construction of Foot Over Bridge in Inner Ring Road at Senthil Nagar Junction.

ii) Construction of Foot Over Bridge in Grand Western Trunk Road near Nelson Manickam Road Junction.

iii) Widening the existing ROB at Km 12/10 including widening of road from Km 12/2 – 13/3 of Inner Ring Road (Dual Five Lane).

III. FOLLOWING WORKS ARE IN DPR STAGE

The preparation of the Detailed Project Reports (DPR) for the following works is in progress:

• Grade Separator at Kattupakkam.

• Grade Separator near Kaiveli, Madipakkam.

• Grade Separator at Avadi.

• Grade Separator near Ambattur Estate Bus Depot.

• Grade Separator at Korattur

• Grade Separator at Kundrathur

• Grade Separator at Vanagaram.

• High Level Bridge across Rajakizhpakkam lake near Selaiyur.

• Foot Over Bridge in Thirumangalam - Mogappair road near DAV and Velammal School.

Further, for the work of “Construction of High Level Bridge across Coovam river in Padikuppam”, DPR completed and the Administrative Sanction proposal for the work is under scrutiny at Government.

IV. WORKS UNDER RAILWAY WORKS PROGRAMME (RWP)

• One Limited Use Subway at LC 6 - Wimco Nagar and balance work in Road Over Bridge (ROB) at LC 14 – Veppampattu are in tender stage. On finalisation of tender, works will be started.

• Two Road Under Bridges (RUBs) viz., a) LC 22 - Tirusulam and b) LC 4 – Thiruvotriyur will be taken up for construction after completion of Railway portion by Railways.

• Two Road Over Bridge works viz., a) Widening of the existing Road Over Bridge at Avadi and b) Construction of the Road Over Bridge at Km 75/6 of Chennai-Thiruttani-Renigunta road will be taken up for construction after completion of Railway portion by Railways. Now, Land Acquisition is in process for these works.

C&M

C&M


Medavakkam Grade separator (Tambaram to Velachery Arm)



C&M

C&M


Velachery Grade Separator
(Level-I - Velachery Bypass Road to Velachery-Tambaram Road Arm)



C&M

C&M


Road Over Bridge at LC 32 Perungalathur (Chengalpattu to Chennai Arm)





தாம்பரம் இரயில் நிலையம் அருகே நகரும் படிக்கட்டுகளுடன் கூடிய நடைமேம்பாலம் Foot Over Bridge with escalator near Tambaram Railway station
pic1



pic2





திருவொற்றியூர் பக்கிங்காம் கால்வாயின் குறுக்கே உயர்மட்டப் பாலம் High Level Bridge across Buckingham canal in Thiruvotriyur
pic3



pic4





கடவு எண்: 32 பெருங்களத்தூர் இரயில் நிலையம் அருகில் இரயில்வே மேம்பாலம்
(சீனிவாசராகவா நகர் பாலப்பகுதி)
Road Over Bridge at LC 32 Perungalathur
(Srinivasa Raghava Nagar Arm)
pic5



pic6



Feedback

Visitors Counter

004339467

Click here to watch Live Events
playicon

Last Updated: 25-04-2024
Click to listen highlighted text! Powered By GSpeech