Welcome to tnhighways   Click to listen highlighted text! Welcome to tnhighways Powered By GSpeech

tnhighways_header_en

Whats-New-tnrsp smartian  
  • Font Plus
  • Font Default
  • Font Minus
Policy Note 2023-24
Public Works Department - Standard Schedule of Rates 2023-2024
SOR 2023-2024 - Corrected Conveyance table
HIGHWAYS DEPARTMENT
CHENNAI PERIPHERAL RING ROAD PROJECT

Chennai Peripheral Ring Road Project is proposed to provide better connectivity to Ennore and Kattupalli ports and to provide better connectivity around the Chennai with provisions for Intelligent Transport System (ITS) to enhance the efficiency and road safety.
The formation of Chennai Peripheral Ring Road (CPRR) is conceptualized to enhance the highway capacity, provide better transport connectivity and provide efficient commercial transportation to ports by linking 4 principal radial arterials, viz. NH 16 (Chennai - Kolkatta National Highway), NH 716 (Chennai – Tirupathi National Highway), NH 48 (Chennai - Bangalore National Highway) and NH 32 (Chennai - Trichy National Highway).
Chennai Peripheral Ring Road is taken up into 5 Sections, having a length of 132.87 Km

Section

Starting from

End at

Length (km)

Project Cost (Rs. Crore)

I

Ennore Port

Thatchur at NH 16 (Chennai - Kolkata National Highway)

25.40

3624.42

II

Thatchur at NH-16 (Chennai – Kolkata National Highway)

Start of Thiruvallur Bypass at NH 716 (Chennai - Tirupathi National Highway)

26.10

6754.40

(For Section II & III)

III

Start of Thiruvallur Bypass at NH716 (Chennai – Tirupathi National Highway)

Sriperumpudur at NH 48 (Chennai -Bangalore National Highway)

30.10

IV

Sriperumpudur at NH -48 (Chennai- Bangalore National Highway)

Singaperumalkoil at NH 32

(Chennai- Trichy National Highway)

23.80

584.00

V

Singaperumalkoil at NH- 32

(Chennai- Trichy National Highway)

Poonjeri Junction near Mamallapuram at East Coast Road (ECR)

27.47

747.92 (land acquisition work only)

CPRR MAP

CPRR-EN

SECTION I

CPRR-EN

1. ROAD CONFIGURATION

• Ennore port to Thatchur at NH-16 (old NH-5 – Chennai Kolkata Highway) including one spur link road to Chennai Outer Ring Road (CORR)
• Length of the Road : 25.40KM

CPRR-EN

Proposed Right of Way

: 100m

Main Carriageway

: 6 lanes divided Carriageway with paved shoulder

Service Road

: 2-lane on either side

Footpath

: 3m wide on both sides (utility space under footpath)

Central Median

: 8.50 m wide

Funding Agency

: Japan International Cooperative Agency

Executing Agency

: Tamil Nadu Road Development Company

CPRR-EN

CPRR-EN

2. STATUS OF WORK:

· 96 % of Land Acquisition work has been completed.

· Consultant for Construction Supervision and Implementation of Land Acquisition & Resettlement and Rehabilitation are appointed.

· The contract agreement for the civil works has been executed.

SECTION II

CPRR-EN

1. ROAD CONFIGURATION

· Connects Thatchur at NH-16 (old NH-5 – Chennai Kolkata Highway), Start of Thiruvallur Bypass at NH-716 (old NH-205 – Chennai Tirupathi Highway)

· Length of the Road: 26.10 KM

  . 13.30KM -Package EPC-01 starts from Thatchur at NH-16 to Punnapakkam.

  . 12.80KM - Package EPC-02 starts from Punnapakkam to the Start of Thiruvallur Bypass at NH-716.

CPRR-EN

Proposed Right of Way

: 60m

Main Carriageway

: 6 lanes divided Carriageway with paved shoulder

Service Road

: 2-lane on both sides

Footpath

: 3m wide on either side (utility space under footpath)

Central Median

: 8.50 m wide



Funding Agency

Asian Infrastructure Investment Bank and OPEC Fund for International Development

Executing Agency

Tamil Nadu Road Infrastructure Development Corporation

(TNRIDC)



CPRR-EN

CPRR-EN

2. STATUS OF WORK

· Land Acquisition is in progress.

· Consultant for Project Management Consultancy, Construction Supervision for Section II, Implementation of Land Acquisition & Resettlement and Rehabilitation for Section II & III and Monitoring the resettlement Action plan Implementation for Section II & III are appointed.

· The tender was floated for the Civil works in 2 EPC Packages

  · Package EPC-01: The Contract Agreement has been signed. Design work is in progress by the contractor.

  · Package EPC-02: Technical Evaluation completed. Financial bid will be opened on 03.02.2022.

Section III


CPRR-EN

1. ROAD CONFIGURATION

· Connects Thiruvallur Bypass NH-716 (old NH-205 – Chennai Tirupathi Highway) and Sriperumbudur NH-48 (old NH-4 – Chennai Bangalore Highway)

· Length of the Road: 30.10 KM

· 10.40KM -Package EPC-03 starts from Thiruvallur Bypass at NH-716 to Vengathur.

· 10.00 KM- Package EPC-04 starts from Vengathur to Sengadu

· 9.70 KM- Package EPC-05 starts from Sengadu to Sriperumpudur

CPRR-EN

Length of Stretch

: 30.10Kms

Connection

: Connects Thiruvallur Bypass NH-716 (old NH-205 – Chennai Tirupathi Highway) and Sriperumbudur NH-48 (old NH-4 – Chennai Bangalore Highway)

Proposed Section

: 6 Lane divided Carriageway with Paved Shoulder + 2 Lane Service Road on both sides

Executing Agency

: Tamil Nadu Road Infrastructure Development Corporation

Work Status

: Land Acquisition is in progress

Funding Agency

: Asian Infrastructure Investment Bank and OPEC Fund for International Development



Funding Agency

: Asian Infrastructure Investment Bank and OPEC Fund for International Development

Executing Agency

:Tamil Nadu Road Infrastructure Development Corporation

(TNRIDC)

CPRR-EN

CPRR-EN

2. STATUS OF WORK

· Land Acquisition is in progress.

· The tender has been invited for the Civil works in EPC-03& 04 Packages on 18.11.2021 and the last date of bid submission is 03.01.2022.

· Package EPC-05: Tender documents are under preparation



Section IV


CPRR-EN

Length of Stretch

: 23.80Kms

Connection

: Connects Sriperumbudur NH-48 (old NH-4 – Chennai Bangalore Highway) and SingaperumalKoil NH-32 (old NH-45- Chennai- Nagapattinam Highway)

Proposed Section

: 6 Lane divided Carriageway with Paved Shoulder + 2 Lane Service Road on either side

Executing Agency

: Tamil Nadu Road Infrastructure Development Corporation

Work status

: Work Completed

Section V


CPRR-EN


Length of Stretch

: 27.47 Kms

Connection

: Connects SingaperumalKoil NH-32 (old NH-45- Chennai- Nagapattinam Highway) and Mamallapuram at Poonjeri Junction in East Coast Road (ECR)

Proposed Section

: 4 Lane divided Carriageway with Paved Shoulder + 2 Lane Service Road on either side

Executing Agency

: Tamil Nadu Road Infrastructure Development Corporation

Work status

: LA is in progress.

Funding Agency

: Yet to be identified.


Feedback

Visitors Counter

004295761

Click here to watch Live Events
playicon

Last Updated: 18-04-2024
Click to listen highlighted text! Powered By GSpeech